Pekerjaan Pengadaan dan Pemasangan Tower dan Pondasi Tower (Seksi-B) T/L 275 kV Meulaboh – Sigli, 208 Km, 2CCT, Twin Zebra
Contract: 021.PJ.PLN2008/131/PIKITRING SUAR/2008
Period: Aug 2008 – Jun 2012
Pekerjaan Pembangunan Gardu Induk 150 kV Meulaboh (1×30 MVA) dan PLTU Meulaboh (Ext)
Contract: 004.PJ.2011/133/INKTRING SUAR/2011
Period: Dec 2011 – Jan 2020
Pekerjaan Pembangunan Transmisi 150 kV Tele – Pangururan
Contract: 020.PJ.2011/131/INKTRING SUAR/2011
Period: Dec 2011 – Dec 2020
Pekerjaan Pembangunan Transmisi 150 kV Meulaboh – Blang Pidie, 82,09 Km, 2 CCT, ACSR 1×240/20 MM2 (Section 1)
Contract: 030.PJ.2011/131/INKTRING SUAR/2011
Period: Dec 2011 – Jan 2021
Pekerjaan Pembangunan T/L 150 kV Ulee Kareng – Krueng Raya (Section 1) dan GI 150 kV Krueng Raya 30 MVA
Contract: 085.PJ.PLN2017/DAN.02.02/UIP II/2017
Period: Jun 2017 – Sep 2021
Pekerjaan Pembangunan T/L 150 kV Ulee Kareng – Krueng Raya (Section 2) dan GI 150 kV Ulee Kareng Ext
Contract: 086.PJ.PLN2017/DAN.02.02/UIP II/2017
Period: Jun 2017 – Sep 2021
Pekerjaan Pembangunan T/L 150 kV Blang Pidie – Tapak Tuan (Section 1) dan GI 150 kV Tapak Tuan 30 MVA
Contract: 087.PJ.PLN2017/DAN.02.02/UIP II/2017
Period: Jun 2017 – Mar 2024
8
Completed
Pekerjaan Sipil GITET 275 kV Ulee Kareng
Contract: 122.PJ.PLN2017/DAN.02.02/UIP II/2017
Period: Jul 2017 – Feb 2022
9
Completed
Pembangunan T/L 275 kV Sigli – Ulee Kareng, 2CCT, 2 Zebra (Section 1)
Contract: 266.PJ.PLN2017/DAN.02.02/UIP SBU/2017
Period: Dec 2017 – Mar 2024
10
Completed
Pembangunan T/L 275 kV Sigli – Ulee Kareng, 2CCT, 2 Zebra (Section 2)
Contract: 267.PJ.PLN2017/DAN.02.02/UIP SBU/2017
Period: Dec 2017 – Mar 2024
11
Completed
Pembangunan T/L 275 kV Sigli – Ulee Kareng, 2CCT, 2 Zebra (Section 3)
Contract: 268.PJ.PLN2017/DAN.02.02/UIP SBU/2017
Period: Dec 2017 – Mar 2024
12
Completed
Pembangunan PLTA Kumbih-3 (3×15 MW) LOT 1A (Pembangunan Prasarana Basecamp)
Contract: 008.PJ.PLN2022/DAN.01.02/C37000000/2022
Period: Dec 2022 – Feb 2025
13
Completed
Pekerjaan Perbaikan Access Road PLTA Asahan 3
Contract: 003.PJ.PLN2024/DAN.01.02/F37000000/2024
Period: Aug 2024 – Feb 2026
14
Completed
Pekerjaan Keadaan Darurat (Emergency) T/L 150 kV Pangkalan Brandan – Langsa Pasca-Bencana Hidrometeorologi di Wilayah Provinsi Aceh & Sumatera Utara (Lingkup Pekerjaan Sipil)
Contract: 013.PJ.PLN2026/DAN.01.03/F36000000/2026
Period: Feb 2026 – 31 July 2026
Pekerjaan Keadaan Darurat (Emergency) T/L 150 kV Pangkalan Brandan – Langsa Pasca-Bencana Hidrometeorologi di Wilayah Provinsi Aceh & Sumatera Utara (Lingkup Pekerjaan Sipil)
- Contract:
- 013.PJ.PLN2026/DAN.01.03/F36000000/2026
- Period:
- Feb 2026 – 31 July 2026